• About
  • Safety
  • Quality
  • Our Work
    • Industrial
    • Transportation
  • Locations
  • Careers
  • Contact
  • Apply Today
  • COVID-19
Header1.jpg
Mass Electric
  • About
    • Culture and Values
    • Environmental
    • Ethics and Compliance
    • MEC Innovation
    • Giving Back
    • Business with Us
    • History
    • Opportunities
  • Safety
  • Quality
    • Testimonials
  • Our Work
    • Industrial
    • Transportation
  • Locations
    • Offices
    • Projects
  • Careers
    • Experienced
    • New Grad and Entry Level
    • Internship or Co-op
    • Skilled Craft
    • Development
    • Benefits
    • Career Search
  • Contact
  • Apply Today
  • COVID-19
Hide Search Field
Show Search Field

Foothills Extension Phase 2A Design-Build

Home    »    Our Work    »    Transportation    »    Transit & Rail    »    Foothills Extension Phase 2A Design-Build

Related Projects

  • CATS South Corridor LRT Electrification System
  • Central Phoenix/East Valley Light Rail Transit Project
  • DART Green Line (CMGC-1)
  • Expo Line Culver City LRT Phase I
  • Expo Line Culver City to Santa Monica LRT Phase II
  • Foothills Extension Phase 2A Design-Build
  • Hellgate Line Catenary Modifications
  • Houston LRT Phase II
  • Metrolink Communication & Signal Maintenance Services
  • Metrolink Positive Train Control
  • Northeast Corridor
  • Northwest Rail Operating Facility (NWROF) Bid-Build
  • Orange Line Phase I – MIC to Earlington Heights Connector
  • Ottawa Confederation Line Extension
  • Phoenix Central Mesa Extension
  • Portland I-205 Extension
  • RTD, Union Station
  • SCRRA Metrolink Communication & Signals Installation
  • T-REX (Transportation Expansion Project) Light Rail
  • TRAX Airport Extension
  • TRAX Light Rail System
  • Tren Urbano-Rio Piedras Rapid Transit System
  • UTA Draper Extension
  • Ybor Historic Trolley

Back to Previous Page

View Summary List of Related Projects

Foothills Extension Phase 2A Design-Build - Monrovia, Calif.

This design-build project, in which Mass. Electric is a subcontractor to Foothill Transit Constructors, a Kiewit/Parsons JV, involves constructing 11.5 miles of Double Light Rail Track from the terminus of the existing Gold Line in Pasadena to Citrus Avenue in Azuza, California.

Mass. Electric’s scope of work includes the complete systems package, involving train control and signaling, grade crossings, communications, station electrical, overhead catenary and traction power and all associated ductbanks.

There are six (6) at-grade Passenger Stations, 8 Traction Power Substations, 13 miles of Standard Overhead Catenary (OCS) and 15 miles of double messenger OCS, as well as shifting 3.8 miles of an existing freight line and integrating the Frieght and Light Rail Signaling Systems. In addition, the project has a large Maintenance and Operations Facility which includes a Control Center, approximately 25 tracks, 30 thousand feet of contact wire, 80 signals and 60 switch machines.

Quick Links
  • Home
  • About
  • Safety
  • Quality
  • Locations
  • Careers
  • Contact
Featured Projects
RTD, Union Station
RTD, Union Station
Denver, Colo.
Read More
Midtown Tunnel Project
Midtown Tunnel Project
Norfolk and Portsmouth, Va.
Read More
Contact MEC

MEC Transportation:

 4790 Regent Blvd., Suite 100
Irving, TX 75063
 

MEC Industrial:

 400 Totten Pond Road, Suite 400
Waltham, MA 02451-2051
 

 

General Info : 

info@masselec.com

 

Quick Links

  • Home
  • About
  • Safety
  • Quality
  • Locations
  • Careers
  • Contact

Featured Projects

RTD, Union Station
RTD, Union Station
Denver, Colo.
Read More
Midtown Tunnel Project
Midtown Tunnel Project
Norfolk and Portsmouth, Va.
Read More

Contact MEC

MEC Industrial:

 400 Totten Pond Road, Suite 400
Waltham, MA 02451-2051
 

MEC Transportation:

 4790 Regent Blvd., Suite 100
Irving, TX 75063
 

 

General Info : 

info@masselec.com

 
© 2023 Mass. Electric Construction Co. All Rights Reserved.
  • Privacy Statement
  • Terms & Conditions
Proud member of the International Brotherhood of Electrical Workers.
Menu