• About
  • Safety
  • Quality
  • Our Work
    • Industrial
    • Transportation
  • Locations
  • Careers
  • Contact
  • Apply Today
  • COVID-19
Header1.jpg
Mass Electric
  • About
    • Culture and Values
    • Environmental
    • Ethics and Compliance
    • MEC Innovation
    • Giving Back
    • Business with Us
    • History
    • Opportunities
  • Safety
  • Quality
    • Testimonials
  • Our Work
    • Industrial
    • Transportation
  • Locations
    • Offices
    • Projects
  • Careers
    • Experienced
    • New Grad and Entry Level
    • Internship or Co-op
    • Skilled Craft
    • Development
    • Benefits
    • Career Search
  • Contact
  • Apply Today
  • COVID-19
Hide Search Field
Show Search Field

Foothills Extension Phase 2A Design-Build

Home    »    Our Work    »    Industrial    »    Special Systems    »    Foothills Extension Phase 2A Design-Build

Related Projects

  • Central Artery/Tunnel Security Project
  • Farley Pavilion Electrical Room Upgrade
  • Foothills Extension Phase 2A Design-Build
  • Hellgate Line Catenary Modifications
  • Leonard P. Zakim / Bunker Hill Bridge
  • Midtown Tunnel Project
  • OCSD Variable Frequency Drives Upgrades Project

Back to Previous Page

View Summary List of Related Projects

Foothills Extension Phase 2A Design-Build - Monrovia, Calif. 

This design-build project, in which Mass. Electric was a subcontractor to Foothill Transit Constructors, a Kiewit/Parsons JV, involved constructing 11.5 miles of Double Light Rail Track from the terminus of the existing Gold Line in Pasadena to Citrus Avenue in Azuza, California.

Mass. Electric’s scope of work included the complete systems package, involving train control and signaling, grade crossings, communications, station electrical, overhead catenary and traction power and all associated ductbanks.

There are six (6) at-grade passenger stations, 8 traction power substations, 13 miles of standard Overhead Catenary (OCS) and 15-miles of double messenger OCS. Work also included the shifting of 3.8 miles of an existing freight line and integrating the Frieght and Light Rail Signaling Systems. Additionally, the project had a large Maintenance and Operations Facility which includes a control center, approximately 25 tracks, 30 thousand feet of contact wire, 80 signals and 60 switch machines. 

Quick Links
  • Home
  • About
  • Safety
  • Quality
  • Locations
  • Careers
  • Contact
Featured Projects
RTD, Union Station
RTD, Union Station
Denver, Colo.
Read More
Midtown Tunnel Project
Midtown Tunnel Project
Norfolk and Portsmouth, Va.
Read More
Contact MEC

MEC Transportation:

 4790 Regent Blvd., Suite 100
Irving, TX 75063
 

MEC Industrial:

 400 Totten Pond Road, Suite 400
Waltham, MA 02451-2051
 

 

General Info : 

info@masselec.com

 

Quick Links

  • Home
  • About
  • Safety
  • Quality
  • Locations
  • Careers
  • Contact

Featured Projects

RTD, Union Station
RTD, Union Station
Denver, Colo.
Read More
Midtown Tunnel Project
Midtown Tunnel Project
Norfolk and Portsmouth, Va.
Read More

Contact MEC

MEC Industrial:

 400 Totten Pond Road, Suite 400
Waltham, MA 02451-2051
 

MEC Transportation:

 4790 Regent Blvd., Suite 100
Irving, TX 75063
 

 

General Info : 

info@masselec.com

 
© 2023 Mass. Electric Construction Co. All Rights Reserved.
  • Privacy Statement
  • Terms & Conditions
Proud member of the International Brotherhood of Electrical Workers.
Menu