• About
  • Safety
  • Quality
  • Our Work
    • Industrial
    • Transportation
  • Locations
  • Careers
  • Contact
  • Apply Today
  • COVID-19
Header3.jpg
Mass Electric
  • About
    • Culture and Values
    • Environmental
    • Ethics and Compliance
    • MEC Innovation
    • Giving Back
    • Business with Us
    • History
    • Opportunities
  • Safety
  • Quality
    • Testimonials
  • Our Work
    • Industrial
    • Transportation
  • Locations
    • Offices
    • Projects
  • Careers
    • Experienced
    • New Grad and Entry Level
    • Internship or Co-op
    • Skilled Craft
    • Development
    • Benefits
    • Career Search
  • Contact
  • Apply Today
  • COVID-19
Hide Search Field
Show Search Field

Mass Maritime Academy Wind Turbine Installation

Home    »    Our Work    »    Industrial    »    Renewable Energy    »    Mass Maritime Academy Wind Turbine Installation

Related Projects

  • Groveland 3.6MW Solar Farm
  • IBEW Local 103 Wind Turbine Installation
  • Mass Maritime Academy Wind Turbine Installation
  • Milton Academy 192.27 kWP Roof-Mounted Solar Array
  • North Brookfield 2.5MW Solar Project
  • Northbridge 2.6MW Solar Project
  • Palmer 1.2MW Solar Project
  • Shrewsbury Solar Farm
  • St. Joseph's Abbey 20.3MW Solar Project
  • Sun Edison Solar Panel Installation
  • Waltham High School Roof-Mounted PV System
  • West Greenwich 2.1MW Solar Project

Back to Previous Page

View Summary List of Related Projects

Mass Maritime Academy Wind Turbine Installation - Buzzards Bay, Mass.

On April 11, 2006, a Mass. Electric Construction Co. (MEC) led joint venture was awarded a contract for the electrical wiring and setting of a 248-foot, 6,660kW turbine for Mass Maritime Academy.

The installation consisted of beacon lights and lighting inside of the nacelle, anemometer/wind vane, pulling and installation of 500MCM cable from the nacelle to the base of the tower to the transformer, running cable in the top section of the tower to the rotor and controller and all connections to switchgear in the control room.

MEC was an electrical subcontractor for the installation of the 248-foot tall, Vestas V47 660kW wind turbine. The turbine provides approximately one third of the academy’s annual power needs and is estimated to save about $300,000 each year.

Quick Links
  • Home
  • About
  • Safety
  • Quality
  • Locations
  • Careers
  • Contact
Featured Projects
RTD, Union Station
RTD, Union Station
Denver, Colo.
Read More
Midtown Tunnel Project
Midtown Tunnel Project
Norfolk and Portsmouth, Va.
Read More
Contact MEC

MEC Transportation:

 4790 Regent Blvd., Suite 100
Irving, TX 75063
 

MEC Industrial:

 400 Totten Pond Road, Suite 400
Waltham, MA 02451-2051
 

 

General Info : 

info@masselec.com

 

Quick Links

  • Home
  • About
  • Safety
  • Quality
  • Locations
  • Careers
  • Contact

Featured Projects

RTD, Union Station
RTD, Union Station
Denver, Colo.
Read More
Midtown Tunnel Project
Midtown Tunnel Project
Norfolk and Portsmouth, Va.
Read More

Contact MEC

MEC Industrial:

 400 Totten Pond Road, Suite 400
Waltham, MA 02451-2051
 

MEC Transportation:

 4790 Regent Blvd., Suite 100
Irving, TX 75063
 

 

General Info : 

info@masselec.com

 
© 2023 Mass. Electric Construction Co. All Rights Reserved.
  • Privacy Statement
  • Terms & Conditions
Proud member of the International Brotherhood of Electrical Workers.
Menu