Header3.jpg
Mass Electric
  • About
    • Culture and Values
    • Environmental
    • Ethics and Compliance
    • MEC Innovation
    • Giving Back
    • Business with Us
    • History
    • Opportunities
  • Safety
  • Quality
    • Testimonials
  • Our Work
    • Industrial
    • Transportation
  • Locations
    • Offices
    • Projects
  • Careers
    • Experienced
    • New Grad and Entry Level
    • Internship or Co-op
    • Skilled Craft
    • Development
    • Benefits
    • Career Search
  • Contact
  • Apply Today
  • COVID-19
Hide Search Field
Show Search Field

Homer City Units 1 & 2 AQCS Project

Home    »    Our Work    »    Industrial    »    Power & Energy    »    Homer City Units 1 & 2 AQCS Project

Related Projects

  • Goethals 345kV Substation
  • Haynes 5 & 6 Repowering Project
  • Homer City Units 1 & 2 AQCS Project
  • Iatan Coal-Fired Power Plant
  • Watson Generating Station

Back to Previous Page

View Summary List of Related Projects

Homer City Units 1 & 2 AQCS Project - Homer City, Pa.

The Homer City Power Plant in Homer City, Pennsylvania, has stood above the city for over 43 years. The 1,884-megawatt plant generates enough power for 2 million homes. In order to meet new federal clean air standards set for 2014, new scrubbers were added to the chimneys to cut down on air pollution.

Before upgrades were completed, Homer City Power Plant was labeled as one of the dirtiest power plants in the country; it is now one of the cleanest. The scrubbers remove 100,000 tons of sulfur dioxide emissions per year. “Bag Houses” are attached to the chimneys to remove particle matter from escaping. The dry scrubbers work by piping the plant’s exhaust emissions through a lime mix ­fed by adjacent silos. The mixture chemically bonds with the sulfur dioxide. The waste ash that is produced is landfilled onsite.

MEC’s scope of work included the management of crews on the installation of all ductbank, conduit, cable tray, wire and terminations associated with Novel Integrated Deacidification (NID) for Units 1 & 2. MEC managed crews relocated an existing cable tray, which feeds all units at the power plant. The work took place while maintaining an operational plant. MEC also oversaw the installation of 2 additional 23kV breakers, buss, foundations, steel and ductbank associated with the switchyard.

Quick Links
  • Home
  • About
  • Safety
  • Quality
  • Locations
  • Careers
  • Contact
Featured Projects
RTD, Union Station
RTD, Union Station
Denver, Colo.
Read More
Midtown Tunnel Project
Midtown Tunnel Project
Norfolk and Portsmouth, Va.
Read More
Contact MEC

MEC Transportation:

 4790 Regent Blvd., Suite 100
Irving, TX 75063
 

MEC Industrial:

 400 Totten Pond Road, Suite 400
Waltham, MA 02451-2051
 

 

General Info : 

info@masselec.com

 

Quick Links

  • Home
  • About
  • Safety
  • Quality
  • Locations
  • Careers
  • Contact

Featured Projects

RTD, Union Station
RTD, Union Station
Denver, Colo.
Read More
Midtown Tunnel Project
Midtown Tunnel Project
Norfolk and Portsmouth, Va.
Read More

Contact MEC

MEC Industrial:

 400 Totten Pond Road, Suite 400
Waltham, MA 02451-2051
 

MEC Transportation:

 4790 Regent Blvd., Suite 100
Irving, TX 75063
 

 

General Info : 

info@masselec.com

 
© 2023 Mass. Electric Construction Co. All Rights Reserved.
  • Privacy Statement
  • Terms & Conditions
Proud member of the International Brotherhood of Electrical Workers.
Menu